For homes and properties that cannot connect to the mains sewer network, managing wastewater safely and effectively is an important consideration. One increasingly common solution is a sewage treatment plant — a compact system designed to treat wastewater on site before safely discharging the treated effluent.

Whether you are building a new property, replacing an existing septic tank or upgrading an older private drainage system, choosing the right solution involves more than simply installing a tank in the ground.

From site conditions and access requirements to discharge arrangements and environmental regulations, there are several factors that need to be considered before installation.

In this guide, we look at how sewage treatment plants work, when they may be required and some of the key regulations property owners in Wales need to be aware of.

What Is a Sewage Treatment Plant?

A sewage treatment plant, sometimes referred to as a package treatment plant, is a private wastewater treatment system commonly used where connection to a public foul sewer is not practical.

Wastewater from toilets, bathrooms, kitchens and other domestic facilities enters the treatment plant, where solids are separated and biological processes break down organic matter.

Unlike a basic septic tank, a sewage treatment plant provides a higher level of treatment before the wastewater leaves the system. Depending on the site and relevant permissions, treated effluent may then be discharged through a drainage field into the ground or, in appropriate circumstances, to a suitable watercourse.

This makes sewage treatment plants particularly useful for rural properties and developments where mains drainage is unavailable.

When Might You Need a Sewage Treatment Plant?

Private sewage treatment systems are often found in rural parts of Wales where properties can be a significant distance from the public sewer network.

A sewage treatment plant may be considered when:

  • constructing a new property without a practical connection to mains drainage;

  • replacing an ageing or unsuitable septic tank;

  • upgrading an existing private drainage system;

  • developing several properties in a location without mains sewerage;

  • an existing system no longer meets the requirements of the property; or

  • a higher standard of wastewater treatment is required.

Before deciding on a private system, however, the possibility of connecting to a public foul sewer needs to be considered.

Natural Resources Wales states that, for its small sewage discharge registration scheme, a property should generally be at least 30 metres from a public foul sewer where one property requires drainage. Where several properties are involved, this distance is calculated at 30 metres multiplied by the number of properties.

How Does a Sewage Treatment Plant Work?

Although designs vary between manufacturers, most domestic sewage treatment plants follow the same basic principles.

Wastewater first enters the plant, where heavier solid material is separated from the liquid.

The wastewater then moves through a treatment process in which naturally occurring microorganisms break down organic pollutants. Many systems introduce air into this part of the process to help the bacteria work effectively.

After treatment, remaining solids are separated and the treated effluent leaves the plant through the approved discharge arrangement.

Because sewage treatment plants use mechanical and biological treatment processes, they require electricity, servicing and regular maintenance to continue working correctly.

Natural Resources Wales advises that most package sewage treatment plants require professional servicing approximately every 12 months, with more detailed checks often carried out every six months. Sludge will also need to be removed periodically.

Sewage Treatment Plant Regulations in Wales

Installing a sewage treatment plant involves both environmental and building regulation requirements.

One of the main pieces of legislation governing private sewage discharges in Wales is:

The Environmental Permitting (England and Wales) Regulations 2016 – SI 2016/1154

The Regulations include specific provisions covering small discharges of sewage effluent in Wales.

For small domestic systems, Natural Resources Wales operates a registration system. In many cases, a qualifying septic tank or small sewage treatment plant can be registered as exempt from the need for a full environmental permit.

For a system to qualify for this registration, a number of conditions must be met. These include requirements relating to the type and volume of discharge, proximity to sensitive environmental areas, access to the public sewer network and the design and installation of the treatment system.

Natural Resources Wales currently states that qualifying systems can include domestic sewage discharges of:

  • less than 2,000 litres per day to the ground through a drainage field; or

  • less than 5,000 litres per day to a watercourse.

Other eligibility requirements also apply, so these figures should not be considered permission to discharge by themselves.

Where the conditions for exemption cannot be met, an Environmental Permit from Natural Resources Wales may be required.

What Standards Do Sewage Treatment Plants Need to Meet?

Natural Resources Wales also specifies standards relating to the construction and performance of private sewage systems.

For package or site-assembled domestic sewage treatment plants, the relevant standard falls within:

BS EN 12566 – Small wastewater treatment systems for up to 50 PT

Natural Resources Wales specifically references BS EN 12566 Part 3 for package or site-assembled domestic sewage treatment plants.

Where treated wastewater is discharged to the ground, the drainage field must also meet the relevant requirements of BS 6297.

These standards help ensure that treatment systems are properly manufactured, sized and capable of treating wastewater effectively.

Building Regulations and Planning

Environmental registration or permitting is only one part of the process.

Sewage treatment installations may also require Building Regulations approval and, depending on the project, planning permission.

In Wales, Approved Document H – Drainage and Waste Disposal provides guidance relating to wastewater treatment systems.

Among other requirements, it considers the capacity, siting and construction of wastewater treatment systems, protection of water sources and the prevention of pollution.

The guidance states that systems should be designed and positioned so that they do not create a health risk, nuisance, pollution risk or unacceptable impact on water sources.

Because every site is different, the regulatory requirements should be considered during the planning stage rather than after excavation or installation has begun.

What Is Involved in Installing a Sewage Treatment Plant?

A successful sewage treatment plant installation starts well before the plant itself arrives on site.

The first stage is assessing the property and understanding how the proposed system will work within the available space.

Considerations can include:

  • the number of people or properties the system will serve;

  • expected wastewater volumes;

  • ground conditions;

  • groundwater levels;

  • the proposed discharge method;

  • proximity to buildings and boundaries;

  • nearby watercourses, wells or boreholes;

  • access for excavation machinery;

  • future access for servicing and emptying; and

  • connections between the property and treatment plant.

Once the system and location have been established, excavation can begin.

Depending on the project, installation may involve substantial groundworks, including excavation for the treatment plant, preparation of a suitable base, drainage connections, installation of pipework, construction of a drainage field or discharge system and reinstatement of the surrounding ground.

Good planning at this stage can make a significant difference to both the performance of the system and its long-term maintainability.

Sewage Treatment Plant or Septic Tank?

Although the two terms are sometimes used interchangeably, sewage treatment plants and septic tanks work differently.

A septic tank primarily separates solid material from wastewater. The liquid leaving the tank then requires further treatment through an appropriate drainage field.

A sewage treatment plant goes further by actively treating the wastewater using biological processes before it is discharged.

For discharges directly to surface water in Wales, Natural Resources Wales states that a package treatment plant must be used rather than a septic tank.

The most appropriate system for any particular property will depend on the location, ground conditions, discharge arrangements and regulatory requirements.

Why Proper Installation Matters

A sewage treatment plant is a long-term part of a property's infrastructure.

Poor siting, inadequate groundwork, incorrect sizing or unsuitable drainage can create expensive problems later, from inefficient treatment and unpleasant odours to drainage failure and environmental pollution.

Professional installation helps ensure that the groundwork, pipework and treatment system are considered together rather than as separate elements.

It is also important to leave suitable access for future maintenance, servicing and desludging. Even a correctly installed sewage treatment plant requires ongoing care to remain effective.

Sewage Treatment Plant Installation in South and West Wales

At HOG Groundworks, we undertake sewage treatment plant groundworks and installation as part of our wider drainage and groundwork services across South and West Wales.

From initial excavation and site preparation through to drainage, pipework, installation and reinstatement, our focus is on creating practical, dependable solutions suited to the individual site.

If you are planning a new sewage treatment plant, replacing an existing private drainage system or need advice on the groundwork involved, get in touch with HOG Groundworks to discuss your project.

Regulations and guidance can change, and the requirements for an individual sewage treatment system depend on the property, discharge location and site conditions. Property owners should check the latest requirements with Natural Resources Wales, their local planning authority and building control before proceeding.

 
 
 