Project Overview

This ongoing new-build project at Sandy Lane centres on the construction of a raft foundation, forming the structural base for the development.

​

The work involves substantial ground preparation, structural steel reinforcement and reinforced concrete construction, supported by extensive use of plant and machinery throughout the foundation stage. As the project progresses, further works will include service installation and an off-grid sewage system, making this a wider groundworks package extending beyond the foundation itself.

Sector:

Residential

Location:

Sandy Lane, Swansea

Project Type:

New Build Raft Foundation

Services:

Groundworks, raft foundation, reinforced concrete, structural steel, plant operations, service installation & off-grid sewage

Scope of Works
  • Site preparation and groundworks

  • Excavation and formation of foundation levels

  • Raft foundation construction

  • Installation of structural steel reinforcement

  • Reinforced concrete works

  • Formwork construction

  • Plant and machinery operations

  • Preparation for incoming services

  • Service installation

  • Off-grid sewage infrastructure

  • Ongoing groundworks associated with the new build

Textured White Surface
IMG_6927.jpg
Our Approach

Following preparation of the site to the required levels, the raft foundation is being formed with extensive steel reinforcement and carefully constructed formwork, creating the structural base required for the new build.

​

An extensive steel reinforcement system forms a key part of the raft construction, designed to work with the reinforced concrete foundation to provide the structural strength required for the new build. The scale and nature of the work also require significant use of plant and machinery for excavation, material handling and other site operations.

​

The foundation forms one stage of a broader programme of works. As construction continues, HOG Groundworks will also be carrying out service installation and delivering an off-grid sewage solution for the property, coordinating these elements with the wider development.