

Built by HOG
Sandy Lane Sewage Treatment Plant


Project Overview
This project at Sandy Lane involved the installation of an off-grid sewage treatment system alongside substantial retaining works required to support and stabilise the surrounding site.
The scheme brought together specialist knowledge of private sewage treatment, excavation, drainage and structural groundworks. Gabion retaining walls were constructed using stone excavated during the works, allowing material already available on site to be repurposed rather than removed and replaced with imported stone.
Sector:
Residential
Location:
Sandy Lane, Swansea
Project Type:
Off-Grid Sewage & Retaining Works
Services:
Sewage treatment plant, groundworks, drainage, excavation, gabion retaining walls, site-won stone reuse
Scope of Works
-
Site excavation and preparation
-
Installation of an off-grid sewage treatment plant
-
Associated drainage and pipework
-
Groundworks for the treatment system
-
Formation and preparation of retaining areas
-
Construction of gabion retaining walls
-
Processing and reuse of excavated site stone
-
Backfilling and site reinstatement


Our Approach
Installing a private sewage treatment system requires careful consideration of both the ground conditions and the way treated effluent will be discharged. Excavation and preparation works were carried out to accommodate the treatment system and associated infrastructure, integrating the installation into the wider site.
Private sewage systems in Wales are subject to environmental controls overseen by Natural Resources Wales. Under the Environmental Permitting (England and Wales) Regulations 2016, smaller qualifying sewage discharges can be registered as exempt activities, while installations outside the relevant criteria may require an environmental permit. NRW currently sets registration criteria including maximum domestic discharges of 2,000 litres per day to ground or 5,000 litres per day to a watercourse, alongside requirements relating to the location, design and environmental sensitivity of the site.
The design and installation of package sewage treatment plants must also take account of the relevant technical and building standards. NRW identifies BS EN 12566-3 for package or site-assembled domestic sewage treatment plants, while a discharge to ground through a drainage field must meet BS 6297:2007+A1:2008. Welsh Building Regulations guidance under Approved Document H – Drainage and Waste Disposal also covers wastewater treatment systems and their siting and installation.
Alongside the sewage installation, the site required substantial retaining work. Rather than importing stone for the gabion baskets, suitable material excavated during the groundworks was reused to fill the new retaining structures. This made practical use of site-won material while creating robust retaining walls suited to the character of the surrounding ground.
Before

After


Outcome
The completed works provided the property with an effective off-grid sewage solution while addressing the structural requirements of the surrounding site.
Combining specialist sewage treatment infrastructure with groundworks and gabion construction allowed the different elements to be delivered as one coordinated scheme. Reusing excavated stone within the retaining walls also reduced the need to remove material from site and brought an existing natural resource back into the finished project.







